Drinking Water Lead Testing

Lead In Drinking Water Testing Program

Drinking Water - Lead Testing Program

PWCS recently completed its first round of testing for lead in school drinking water, under Virginia regulations that took effect in 2017. The testing is part of an ongoing PWCS health commitment to ensure that water supplied by all drinking water devices meets federal and state standards. The comprehensive testing program implemented by the PWCS Office of Facilities Services meets or exceeds the latest testing mandate.

Tests have now been completed on all primary drinking water devices at all schools constructed before 1986, as required by the new regulation. The next phase will involve testing of schools constructed after 1986, and finally, tests of administrative and support buildings.

The goal is to ensure that all drinking water devices supply water below the 15 parts per billion (ppb) action level for lead. Tests follow collection of a "first draw sample," after a minimum eight-hour water stagnation period. All testing is conducted by a certified lab.

Devices found to deliver water above the 15 ppb lead action level are immediately taken out of service. Corrective action plan is quickly taken to bring concentrations below the action level. Recent findings led to replacement of faucets. Other actions may include replacement of devices and/or water piping. Water from affected sources is then retested to confirm that levels are below 15 ppb standard before supply devices are put back in use. Following current testing, all PWCS facilities will be put on a three-year sampling rotation to make certain that devices continue to deliver water at or below the action level.

See The Chart Below For Planned Testing Schedules And Current Findings

Lead in drinking water is a potential health concern for children. Schools generally relied on municipal water suppliers, which do their own testing, to keep lead content to acceptable levels in all homes and businesses they serve. Virginia's new law now adds an extra margin of protection for schools. PWCS began the new Virginia-mandated tests before many school divisions and earlier than required. Still, the first phase of tests found only a fraction of water devices delivering concentrations above the action level, and problems were quickly addressed. In most cases, schools that had devices with lead results above the action level sent messages home to inform parents about what was found and what was done to correct it. The information below summarizes the findings to date and will allow everyone to get the latest information on our continuing PWCS efforts to ensure good health and safety by checking the quality of water at our schools.

PHASE I - Pre-1986 Original Construction

Elementary School
School/Facility Original Construction Year Sampling Schedule* Total Samples Samples=> Action Level (15 ppb) Corrective Action Taken (if necessary) Retest Level (post corrective action)
Bel Air 1968 10/25/2019 57 0 None Required None Required
Belmont 1967 10/16/2019 63 2 Re-tested <2
Coles 1968 10/29/2019 47 0 None Required None Required
Dale City 1967 10/23/2019 46 0 None Required None Required
Dumfries 1918 10/25/2019 47 0 None Required None Required
Enterprise 1978 10/29/2019 44 0 None Required None Required
Featherstone 1961 10/18/2019 49 0 None Required None Required
Henderson 1985 10/25/2019 63 0 None Required None Required
Kerrydale 1973 10/30/2019 44 0 None Required None Required
King 1981 10/29/2019 45 0 None Required None Required
Lake Ridge 1983 11/1/2019 68 1 Re-tested 2
Loch Lomond 1962 11/8/2019 50 0 None Required None Required
Marumsco Hills 1966 10/17/2019 55 0 None Required None Required
Minnieville 1972 11/1/2019 76 3 Re-tested <2
Neabsco 1969 10/25/2019 72 0 None Required None Required
Occoquan 1927 10/16/2019 61 0 None Required None Required
Pattie 1978 10/25/2019 60 0 None Required None Required
Potomac View 1964 10/16/2019 56 0 None Required None Required
Rockledge 1972 10/29/2019 47 1 Re-test <2
Sinclair 1968 11/14/2019 60 0 None Required None Required
Springwoods 1985 11/11/2019 73 0 None Required None Required
Sudley 1972 11/14/2019 61 0 None Required None Required
Tyler 1968 11/14/2019 53 1 Re-test 3
Vaughan 1964 10/18/2019 52 0 None Required None Required
Washington-Reid 1951 10/24/2019 23 1 Re-test <2
West Gate 1964 11/13/2019 59 3 Re-test 3,3,2

Middle School
School/Facility Original Construction Year Sampling Schedule* Total Samples Samples=> Action Level (15 ppb) Corrective Action Taken (if necessary) Retest Level (post corrective action)
Graham Park 1963 10/24/2019 52 2 Re-test 2
Hampton 1970 10/23/2019 45 1 Remove device None Required
Lynn 1964 10/17/2019 79 2 Re-test <2
Parkside 1963 11/8/2019 62 1 Re-test <2
Rippon 1967 10/17/2019 58 1 Re-test <2
Unity Braxton 1964 11/14/2019 45 1 Re-test 2
Woodbridge 1963 10/17/2019 43 1 Re-test <2

High School
School/Facility Original Construction Year Sampling Schedule* Total Samples Samples=> Action Level (15 ppb) Corrective Action Taken (if necessary) Retest Level (post corrective action)
Brentsville 1965 11/17/2019 47 1 Re-test 2
Gar-Field 1972 10/23/2019 112 2 Re-test 7, <2
Osbourn Park 1975 11/7/2019 106 0 None Required None Required
Potomac 1981 10/24/2019 77 0 None Required None Required
Unity Reed 1973 11/13/2019 126 0 None Required None Required
Woodbridge 1974 10/29/2019 85 4 Re-test 2, <2

Specialty Schools/Programs
School/Facility Original Construction Year Sampling Schedule* Total Samples Samples=> Action Level (15 ppb) Corrective Action Taken (if necessary) Retest Level (post corrective action)
Ann Ludwig 1975 10/10/2019 6 0 None Required None Required
Pennington Traditional 1969 11/7/2019 43 0 None Required None Required
Woodbine Preschool 1953 4/22/2017 7 0 None Required None Required

Phase II - 1986-Present Original Construction

Elementary School
School/Facility Original Construction Year Sampling Schedule* Total Samples Samples=> Action Level (15 ppb) Corrective Action Taken (if necessary) Retest Level (post corrective action)
Alvey 2003 11/10/2017 68 0 None required None Required
Antietam 1990 10/28/2017 51 0 None Required None Required
Ashland 2002 11/28/2017 78 1 Replaced faucet <Action Level
Bennett 1996 11/14/2017 62 1 Not used; valved off None Required
Bristow Run 1998 11/8/2017 64 0 None Required None Required
Buckland Mills 2006 11/10/2017 63 0 None Required None Required
Cedar Point 2001 11/9/2017 68 0 None Required None Required
Covington-Harper 2017 12/8/2017 72 1 Retested <Action Level
Ellis 2004 11/22/2017 55 0 None Required None Required
Fitzgerald 2008 11/30/2017 71 0 None Required None Required
Glenkirk 2005 11/10/2017 68 0 None Required None Required
Gravely 2008 11/10/2017 63 0 None Required None Required
Haymarket 2013 12/2/2017 69 0 None Required None Required
Kilby 2017 12/7/2017 74 0 None Required None Required
Leesylvania 1996 11/4/2017 67 0 None Required None Required
Marshall 1994 11/4/2017 62 0 None Required None Required
McAuliffe 1989 10/26/2017 47 1 Retested <Action Level
Montclair 1991 10/28/2017 72 1 over and 1 close Replaced both <Action Level
Mountain View 1995 11/2/2017 57 1 Faucet replaced <Action Level
Mullen 1990 11/1/2017 61 0 None Required None Required
Nokesville School, The 2013 12/5/2017 99 0 None Required None Required
Old Bridge 1995 11/3/2017 55 0 None Required None Required
Penn 1998 11/4/2017 67 0 None Required None Required
Piney Branch 2011 11/10/2017 75 0 None Required None Required
Porter Traditional 2004 11/17/2017 55 0 None Required None Required
River Oaks 1990 10/28/2017 67 1 Faucet replaced <Action Level
Rosa Parks 2006 11/29/2017 69 1 Filter Installed <Action level
Signal Hill 2000 11/15/2017 67 0 None Required None Required
Swans Creek 2001 11/16/2017 62 0 None Required None Required
Triangle 2010 12/1/2017 73 0 None Required None Required
Victory 2005 11/10/2017 62 0 None Required None Required
Westridge 1989 10/27/2017 53 1 Not used; valved off None Required
Williams 2004 11/21/2017 73 0 None Required None Required
Wilson 2016 12/6/2017 80 1 Retested <Action Level
Wood 2011 12/2/2017 73 0 None Required None Required
Yorkshire 2009 11/22/2017 72 0 None Required None Required
Yung 2015 12/2/2017 78 0 None Required None Required

Middle School
School/Facility Original Construction Year Sampling Schedule* Total Samples Samples=> Action Level (15 ppb) Corrective Action Taken (if necessary) Retest Level (post corrective action)
Benton 2000 12/9/2017 71 0 None Required None Required
Beville 1991 12/9/2017 50 0 None Required None Required
Bull Run 2002 12/12/2017 66 0 None Required None Required
Gainesville 2007 12/13/2017 60 0 None Required None Required
Lake Ridge 1989 12/7/2017 37 0 None Required None Required
Marsteller 2002 12/13/2017 55 1 Filter installed <Action Level
Potomac 2006 12/9/2017 76 1 Not used; valved off None Required
Reagan 2012 12/12/2017 67 1 Re-tested <Action Level
Saunders 1988 12/8/2017 44 0 None Required None Required

High School
School/Facility Original Construction Year Sampling Schedule* Total Samples Samples=> Action Level (15 ppb) Corrective Action Taken (if necessary) Retest Level (post corrective action)
Battlefield 2004 3/27/2018 98 1 Filter installed <Action Level
Colgan 2016 3/28/2018 130 0 None Required None Required
Forest Park 2000 3/27/2018 103 1 Device removed None Required
Freedom 2004 3/27/2018 101 3 Filters installed <Action Level
Hylton 1991 3/28/2018 89 5 Filters installed <Action Level
Patriot 2011 3/28/2018 120 2 Device removed; filter installed <Action level

Specialty Schools/Programs
School/Facility Original Construction Year Sampling Schedule* Total Samples Samples=> Action Level (15 ppb) Corrective Action Taken (if necessary) Retest Level (post corrective action)
Independence Nontraditional School 2017 TBD 48 1 Retested <Action Level
New Directions 2004 5/9/2018 7 0 None Required None Required
Pace West 2012 12/2/2017 34 0 None Required None Required

Administrative Buildings (both pre and post 1986 original construction)
School/Facility Original Construction Year Sampling Schedule* Total Samples Samples=> Action Level (15 ppb) Corrective Action Taken (if necessary) Retest Level (post corrective action)
Brentsville Transportation 1970 5/21/2018 4 0 None Required None Required
Central Transportation 2003 5/2/2018 5 0 None Required None Required
Independent Hill Complex 1985 9/5/2018 52 0 None Required None Required
Kelly Leadership 2008 8/2/2018 49 1 Retested <Action Level
Gar-Field Bus 2014 5/2/2018 2 0 None Required None Required
McCuin Transportation 2002 5/2/2018 3 0 None Required None Required
Potomac Transportation 1988 3 1 Fountain replaced <Action Level

Phase III - Pre-1986 Original Construction

Elementary School
School/Facility Original Construction Year Sampling Schedule* Total Samples Samples=> Action Level (15 ppb) Corrective Action Taken (if necessary) Retest Level (post corrective action)
Bel Air 1968 1/11/2019 6 0 None Required None Required
Belmont 1967 1/8/2019 6 0 None Required None Required
Coles 1968 1/16/2019 5 0 None Required None Required
Dale City 1967 1/11/2019 5 0 None Required None Required
Dumfries 1918 1/9/2019 5 0 None Required None Required
Enterprise 1978 1/16/2019 5 0 None Required None Required
Featherstone 1961 1/9/2019 5 0 None Required None Required
Henderson 1985 1/11/2019 5 0 None Required None Required
Kerrydale 1973 1/11/2019 5 0 None Required None Required
King 1981 1/17/2019 7 0 None Required None Required
Lake Ridge 1983 1/16/2019 6 0 None Required None Required
Loch Lomond 1962 1/17/2019 5 0 None Required None Required
Marumsco Hills 1966 1/9/2019 6 0 None Required None Required
Minnieville 1972 1/23/2019 5 0 None Required None Required
Neabsco 1969 1/11/2019 6 0 None Required None Required
Occoquan 1927 1/10/2019 7 0 None Required None Required
Pattie 1978 1/10/2019 5 0 None Required None Required
Potomac View 1964 1/8/2019 6 0 None Required None Required
Rockledge 1972 1/16/2019 5 0 None Required None Required
Sinclair 1968 1/17/2019 7 0 None Required None Required
Springwoods 1985 1/16/2019 5 0 None Required None Required
Sudley 1972 1/24/2019 7 0 None Required None Required
Tyler 1968 1/9/2019 6 1 Filter placed on faucet, Rm 210 <2
Vaughan 1964 1/9/2019 7 0 None Required None Required
Washington-Reid 1951 1/3/2019 4 0 None Required None Required
West Gate 1964 1/17/2019 7 0 None Required None Required

Middle School
School/Facility Original Construction Year Sampling Schedule* Total Samples Samples=> Action Level (15 ppb) Corrective Action Taken (if necessary) Retest Level (post corrective action)
Graham Park 1963 1/16/2019 5 1 Filters Installed; retested 3-5
Hampton 1970 1/16/2019 4 0 None Required None Required
Lynn 1964 1/16/2019 7 0 None Required None Required
Parkside 1963 1/23/2019 7 0 None Required None Required
Rippon 1967 1/16/2019 7 0 None Required None Required
Stonewall 1964 1/17/2019 4 0 None Required None Required
Woodbridge 1963 1/16/2019 6 0 None Required None Required

High School
School/Facility Original Construction Year Sampling Schedule* Total Samples Samples=> Action Level (15 ppb) Corrective Action Taken (if necessary) Retest Level (post corrective action)
Brentsville 1965 1/29/2019 5 1 Filter to be added
Gar-Field 1972 1/16/2019 10 1 Filter added <2
Osbourn Park 1975 1/25/2019 11 0 None Required None Required
Potomac 1981 1/16/2019 8 1 Filter to be added
Stonewall Jackson 1973 1/24/2019 12 0 None Required None Required
Woodbridge 1974 1/16/2019 7 0 None Required None Required

Specialty Schools/Programs
School/Facility Original Construction Year Sampling Schedule* Total Samples Samples=> Action Level (15 ppb) Corrective Action Taken (if necessary) Retest Level (post corrective action)
Ann Ludwig 1975 1/10/2019 1 0 None Required None Required
Pennington Traditional 1969 1/23/2019 4 0 None Required None Required
Woodbine Preschool 1953 1/3/2019 1 0 None Required None Required

Phase III - 1986-Present Original Construction

Elementary School
School/Facility Original Construction Year Sampling Schedule* Total Samples Samples=> Action Level (15 ppb) Corrective Action Taken (if necessary) Retest Level (post corrective action)
Alvey 2003 2/5/2019 7 0 None required None Required
Antietam 1990 2/8/2019 6 0 None Required None Required
Ashland 2002 1/29/2019 8 0 None Required None Required
Bennett 1996 2/8/2019 7 0 None Required None Required
Bristow Run 1998 1/29/2019 7 0 None Required None Required
Buckland Mills 2006 2/7/2019 7 0 None Required None Required
Cedar Point 2001 1/29/2019 7 0 None Required None Required
Covington-Harper 2017 2/7/2019 8 0 None Required None Required
Ellis 2004 2/8/2019 6 0 None Required None Required
Fitzgerald 2008 2/7/2019 8 0 None Required None Required
Glenkirk 2005 1/29/2019 7 0 None Required None Required
Gravely 2008 2/5/2019 7 0 None Required None Required
Haymarket 2013 2/5/2019 7 0 None Required None Required
Kilby 2017 2/8/2019 8 0 None Required None Required
Leesylvania 1996 2/7/2019 7 0 None Required None Required
Marshall 1994 2/14/2019 7 0 None Required None Required
McAuliffe 1989 2/8/2019 5 0 None Required None Required
Montclair 1991 2/14/2019 8 0 None Required None Required
Mountain View 1995 2/13/2019 6 0 None Required None Required
Mullen 1990 2/26/2019 7 0 None Required None Required
Nokesville School, The 2013 3/22/2019 10 0 None Required None Required
Old Bridge 1995 3/5/2019 6 0 None Required None Required
Penn 1998 3/5/2019 7 0 None Required None Required
Piney Branch 2011 2/26/2019 8 0 None Required None Required
Porter Traditional 2004 5/3/2019 6 0 None Required None Required
River Oaks 1990 3/6/2019 7 0 None Required None Required
Rosa Parks 2006 3/8/2019 8 0 None Required None Required
Signal Hill 2000 2/15/2019 7 0 None Required None Required
Swans Creek 2001 1/24/2019 8 0 None Required None Required
Triangle 2010 3/6/2019 8 0 None Required None Required
Victory 2005 2/26/2019 7 0 None Required None Required
Westridge 1989 3/5/2019 6 0 None Required None Required
Williams 2004 3/6/2019 8 0 None Required None Required
Wilson 2016 3/8/2019 8 0 None Required None Required
Wood 2011 2/27/2019 8 0 None Required None Required
Yorkshire 2009 2/15/2019 8 0 None Required None Required
Yung 2015 2/13/2019 8 0 None Required None Required

Middle School
School/Facility Original Construction Year Sampling Schedule* Total Samples Samples=> Action Level (15 ppb) Corrective Action Taken (if necessary) Retest Level (post corrective action)
Benton 2000 3/5/2019 8 0 None Required None Required
Beville 1991 3/8/2019 6 0 None Required None Required
Bull Run 2002 3/22/2019 7 0 None Required None Required
Gainesville 2007 4/23/2019 6 0 None Required None Required
Lake Ridge 1989 4/10/2019 5 0 None Required None Required
Marsteller 2002 4/24/2019 6 1 Filter installed 6
Potomac 2006 3/6/2019 8 0 None Required None Required
Reagan 2012 4/11/2019 7 0 None Required None Required
Saunders 1988 3/7/2019 6 0 None Required None Required

High School
School/Facility Original Construction Year Sampling Schedule* Total Samples Samples=> Action Level (15 ppb) Corrective Action Taken (if necessary) Retest Level (post corrective action)
Battlefield 2004 2/13/2019 12 0 None Required None Required
Colgan 2016 3/7/2019 12 0 None Required None Required
Forest Park 2000 3/8/2019 10 0 None Required None Required
Freedom 2004 4/9/2019 11 0 None Required None Required
Hylton 1991 4/5/2019 10 0 None Required None Required
Patriot 2011 2/27/2019 12 0 None Required None Required

Specialty Schools/Programs
School/Facility Original Construction Year Sampling Schedule* Total Samples Samples=> Action Level (15 ppb) Corrective Action Taken (if necessary) Retest Level (post corrective action)
Independence Nontraditional School 2017 4/9/2019 8 0 None Required None Required
Pace West 2012 3/22/2019 4 0 None Required None Required

Administrative Buildings (both pre and post 1986 original construction)
School/Facility Original Construction Year Sampling Schedule* Total Samples Samples=> Action Level (15 ppb) Corrective Action Taken (if necessary) Retest Level (post corrective action)
Brentsville Transportation 1970 3/22/2019 1 0 None Required None Required
Central Transportation 2003 5/10/2019 1 0 None Required None Required
Independent Hill Complex 1985 5/3/2019 7 0 None Required None Required
Kelly Leadership 2008 3/22/2019 7 0 None Required None Required
Gar-Field Bus 2014 5/10/2019 1 0 None Required None Required
McCuin Transportation 2002 5/9/2019 1 0 None Required None Required
Potomac Transportation 1988 5/8/2019 2 1 Filter installed; retested 5

Archive

*Sampling Schedule is subject to change depending on school, community, and Parks and Recreation function/event scheduling.

More information on the EPA's Lead Contamination Control Act can be found on the EPA website.

The State of Virginia will enforce the EPA regulations above. The agency tasked with that is the Department of Health, Office of Drinking Water. Visit their webpage devoted to Lead in Child Care Facilities and Schools.

If you have any questions or concerns, please contact Wayne French, the OFS Project Manager, at [email protected] or 703-791-7205.

Last updated: July 13, 2020

November 22, 2019

Phase I - Pre-1986 Original Construction

Elementary School

School/Facility Original Construction Year Sampling Schedule* Total Samples Samples=> Action Level (15 ppb) Corrective Action Taken (if necessary) Retest Level (post corrective action)
Bel Air 5/6/2017 53 0 None Required None Required
Belmont 1967 4/29/2017 50 0 None Required None Required
Coles 5/6/2017 46 2 Faucets replaced <Action Level
Dale City 1967 5/6/2017 48 1 Faucet replaced Room 204 <Action Level
Dumfries 1918 4/22/2017 45 1 Faucet replaced Rm 308 <Action Level
Enterprise 1978 5/27/2017 42 0 None Required None Required
Featherstone 1961 4/22/2017 49 1 Re-sampled; no further action <Action Level
Henderson 1985 6/3/2017 44 1 Faucet replaced <Action Level
Kerrydale 1973 5/13/2017 44 1 Faucet replaced <Action Level
King 1981 5/27/2017 45 4 Units replaced <Action Level
Lake Ridge 1983 5/27/2017 46 0 None Required None Required
Loch Lomond 1962 5/6/2017 45 0 None Required None Required
Marumsco Hills 1966 4/29/2017 53 1 Faucet replaced Rm 304 <Action Level
Minnieville 1972 5/13/2017 50 0 None Required None Required
Neabsco 1969 5/13/2017 49 0 None Required None Required
Occoquan 1927 5/27/2017 66 1 Faucet replaced <Action Level
Pattie 1978 5/27/2017 43 0 None Required None Required
Potomac View 1964 4/29/2017 56 0 None Required None Required
Rockledge 1972 5/13/2017 48 0 None Required None Required
Sinclair 5/6/2017 62 0 None Required None Required
Springwoods 1985 6/3/2017 49 0 None Required None Required
Sudley 1972 5/13/2017 65 0 None Required None Required
Tyler 5/6/2017 53 0 None Required None Required
Vaughan 1964 4/29/2017 52 1 Faucet replaced Rm 115A <Action Level
Washington-Reid 1951 4/22/2017 22 1 Faucet replaced Rm 111 <Action Level
West Gate 1964 4/29/2017 63 0 None Required None Required

Middle School

School/Facility Original Construction Year Sampling Schedule* Total Samples Samples=> Action Level (15 ppb) Corrective Action Taken (if necessary) Retest Level (post corrective action)
Graham Park 1963 6/3/2017 46 4 Filters Installed <Action Level
Hampton 1970 6/10/17 40 0 None Required None Required
Lynn 1964 6/10/17 55 6 Units replaced <Action Level
Parkside 1963 6/10/17 61 2 Units replaced <Action Level
Rippon 1967 6/10/17 62 1 Units replaced <Action Level
Stonewall 1964 6/10/17 36 0 None Required None Required
Woodbridge 1963 6/3/2017 42 1 Faucet replaced <Action Level

High School

School/Facility Original Construction Year Sampling Schedule* Total Samples Samples=> Action Level (15 ppb) Corrective Action Taken (if necessary) Retest Level (post corrective action)
Brentsville 1965 6/17/2017 41 1 Faucet replaced <Action Level
Gar-Field 1972 7/1/2017 99 6 Devices replaced <Action Level
Osbourn Park 1975 6/24/2017 110 6 Units replaced <Action Level
Potomac 1981 7/1/2017 63 4 Units replaced <Action Level
Stonewall Jackson 1973 6/17/2017 122 0 None Required None Required
Woodbridge 1974 7/5/2017 69 2 Faucets replaced <Action Level

Specialty Schools/Programs

School/Facility Original Construction Year Sampling Schedule* Total Samples Samples=> Action Level (15 ppb) Corrective Action Taken (if necessary) Retest Level (post corrective action)
Ann Ludwig 1975 5/27/2017 6 0 None Required None Required
PACE East 1967 5/6/2017 30 6 Filters installed <Action Level
New Dominion 1975 5/13/2017 42 3 Filters installed <Action Level
Pennington Traditional 1969 12/10/2016 39 0 None Required None Required
Woodbine Preschool 1953 4/22/2017 7 0 None Required None Required

Phase II - 1986-Present Original Construction

Elementary School

School/Facility Original Construction Year Sampling Schedule* Total Samples Samples=> Action Level (15 ppb) Corrective Action Taken (if necessary) Retest Level (post corrective action)
Alvey 2003 11/10/17 68 0 None required None Required
Antietam 1990 10/28/17 51 0 None Required None Required
Ashland 2002 11/28/17 78 1 Replaced faucet <Action Level
Bennett 1996 11/14/17 62 1 Not used; valved off None Required
Bristow Run 1998 11/8/17 64 0 None Required None Required
Buckland Mills 2006 11/10/17 63 0 None Required None Required
Cedar Point 2001 11/9/17 68 0 None Required None Required
Covington-Harper 2017 12/8/17 72 1 Retested <Action Level
Ellis 2004 11/22/17 55 0 None Required None Required
Fitzgerald 2008 11/30/17 71 0 None Required None Required
Glenkirk 2005 11/10/17 68 0 None Required None Required
Gravely 2008 11/10/17 63 0 None Required None Required
Haymarket 2013 12/2/17 69 0 None Required None Required
Kilby 2017 12/7/17 74 0 None Required None Required
Leesylvania 1996 11/4/17 67 0 None Required None Required
Marshall 1994 11/4/17 62 0 None Required None Required
McAuliffe 1989 10/26/17 47 1 Retested <Action Level
Montclair 1991 10/28/17 72 1 over and 1 close Replaced both <Action Level
Mountain View 1995 11/2/17 57 1 Faucet replaced <Action Level
Mullen 1990 11/1/17 61 0 None Required None Required
Nokesville School, The 2013 12/5/17 99 0 None Required None Required
Old Bridge 1995 11/3/17 55 0 None Required None Required
Penn 1998 11/4/17 67 0 None Required None Required
Piney Branch 2011 11/10/17 75 0 None Required None Required
Porter Traditional 2004 11/17/17 55 0 None Required None Required
River Oaks 1990 10/28/17 67 1 Faucet replaced <Action Level
Rosa Parks 2006 11/29/17 69 1 Filter Installed <Action level
Signal Hill 2000 11/15/17 67 0 None Required None Required
Swans Creek 2001 11/16/17 62 0 None Required None Required
Triangle 2010 12/1/17 73 0 None Required None Required
Victory 2005 11/10/17 62 0 None Required None Required
Westridge 1989 10/27/17 53 1 Not used; valved off None Required
Williams 2004 11/21/17 73 0 None Required None Required
Wilson 2016 12/6/17 80 1 Retested <Action Level
Wood 2011 12/2/17 73 0 None Required None Required
Yorkshire 2009 11/22/17 72 0 None Required None Required
Yung 2015 12/2/17 78 0 None Required None Required

Middle School

School/Facility Original Construction Year Sampling Schedule* Total Samples Samples=> Action Level (15 ppb) Corrective Action Taken (if necessary) Retest Level (post corrective action)
Benton 2000 12/9/17 71 0 None Required None Required
Beville 1991 12/9/17 50 0 None Required None Required
Bull Run 2002 12/12/17 66 0 None Required None Required
Gainesville 2007 12/13/17 60 0 None Required None Required
Lake Ridge 1989 12/7/17 37 0 None Required None Required
Marsteller 2002 12/13/17 55 1 Filter installed <Action Level
Potomac 2006 12/9/17 76 1 Not used; valved off None Required
Reagan 2012 12/12/17 67 1 Re-tested <Action Level
Saunders 1988 12/8/17 44 0 None Required None Required

High School

School/Facility Original Construction Year Sampling Schedule* Total Samples Samples=> Action Level (15 ppb) Corrective Action Taken (if necessary) Retest Level (post corrective action)
Battlefield 2004 3/27/18 98 1 Filter installed <Action Level
Colgan 2016 3/28/18 130 0 None Required None Required
Forest Park 2000 3/27/18 103 1 Device removed None Required
Freedom 2004 3/27/18 101 3 Filters installed <Action Level
Hylton 1991 3/28/18 89 5 Filters installed <Action Level
Patriot 2011 3/28/18 120 2 Device removed; filter installed <Action level

Specialty Schools/Programs

School/Facility Original Construction Year Sampling Schedule* Total Samples Samples=> Action Level (15 ppb) Corrective Action Taken (if necessary) Retest Level (post corrective action)
Independence Nontraditional School 2017 TBD 48 1 Retested <Action Level
New Directions 2004 5/9/18 7 0 None Required None Required
Pace West 2012 12/2/17 34 0 None Required None Required

Administrative Buildings (both pre and post 1986 original construction)

School/Facility Original Construction Year Sampling Schedule* Total Samples Samples=> Action Level (15 ppb) Corrective Action Taken (if necessary) Retest Level (post corrective action)
Brentsville Transportation 1970 5/21/18 4 0 None Required None Required
Central Transportation 2003 5/2/18 5 0 None Required None Required
Independent Hill Complex 1985 9/5/18 52 0 None Required None Required
Kelly Leadership 2008 8/2/18 49 1 Retested <Action Level
Gar-Field Bus 2014 5/2/18 2 0 None Required None Required
McCuin Transportation 2002 5/2/18 3 0 None Required None Required
Potomac Transportation 1988 3 1 Fountain replaced <Action Level

Phase III - Pre-1986 Original Construction

Elementary School

School/Facility Original Construction Year Sampling Schedule* Total Samples Samples=> Action Level (15 ppb) Corrective Action Taken (if necessary) Retest Level (post corrective action)
Bel Air 1968 1/11/19 6 0 None Required None Required
Belmont 1967 1/8/19 6 0 None Required None Required
Coles 1968 1/16/19 5 0 None Required None Required
Dale City 1967 1/11/19 5 0 None Required None Required
Dumfries 1918 1/9/19 5 0 None Required None Required
Enterprise 1978 1/16/19 5 0 None Required None Required
Featherstone 1961 1/9/19 5 0 None Required None Required
Henderson 1985 1/11/19 5 0 None Required None Required
Kerrydale 1973 1/11/19 5 0 None Required None Required
King 1981 1/17/19 7 0 None Required None Required
Lake Ridge 1983 1/16/19 6 0 None Required None Required
Loch Lomond 1962 1/17/19 5 0 None Required None Required
Marumsco Hills 1966 1/9/19 6 0 None Required None Required
Minnieville 1972 1/23/19 5 0 None Required None Required
Neabsco 1969 1/11/19 6 0 None Required None Required
Occoquan 1927 1/10/19 7 0 None Required None Required
Pattie 1978 1/10/19 5 0 None Required None Required
Potomac View 1964 1/8/19 6 0 None Required None Required
Rockledge 1972 1/16/19 5 0 None Required None Required
Sinclair 1968 1/17/19 7 0 None Required None Required
Springwoods 1985 1/16/19 5 0 None Required None Required
Sudley 1972 1/24/19 7 0 None Required None Required
Tyler 1968 1/9/19 6 1 Filter placed on faucet, Rm 210 <2
Vaughan 1964 1/9/19 7 0 None Required None Required
Washington-Reid 1951 1/3/19 4 0 None Required None Required
West Gate 1964 1/17/19 7 0 None Required None Required

Middle School

School/Facility Original Construction Year Sampling Schedule* Total Samples Samples=> Action Level (15 ppb) Corrective Action Taken (if necessary) Retest Level (post corrective action)
Graham Park 1963 1/16/19 5 1 Filters Installed; retested 3-5
Hampton 1970 1/16/19 4 0 None Required None Required
Lynn 1964 1/16/19 7 0 None Required None Required
Parkside 1963 1/23/19 7 0 None Required None Required
Rippon 1967 1/16/19 7 0 None Required None Required
Stonewall 1964 1/17/19 4 0 None Required None Required
Woodbridge 1963 1/16/19 6 0 None Required None Required

High School

School/Facility Original Construction Year Sampling Schedule* Total Samples Samples=> Action Level (15 ppb) Corrective Action Taken (if necessary) Retest Level (post corrective action)
Brentsville 1965 1/29/19 5 1 Filter to be added
Gar-Field 1972 1/16/19 10 1 Filter added <2
Osbourn Park 1975 1/25/19 11 0 None Required None Required
Potomac 1981 1/16/19 8 1 Filter to be added
Stonewall Jackson 1973 1/24/19 12 0 None Required None Required
Woodbridge 1974 1/16/19 7 0 None Required None Required

Specialty Schools/Programs

School/Facility Original Construction Year Sampling Schedule* Total Samples Samples=> Action Level (15 ppb) Corrective Action Taken (if necessary) Retest Level (post corrective action)
Ann Ludwig 1975 1/10/19 1 0 None Required None Required
Pennington Traditional 1969 1/23/19 4 0 None Required None Required
Woodbine Preschool 1953 1/3/19 1 0 None Required None Required

Phase III - 1986-Present Original Construction

Elementary School

School/Facility Original Construction Year Sampling Schedule* Total Samples Samples=> Action Level (15 ppb) Corrective Action Taken (if necessary) Retest Level (post corrective action)
Alvey 2003 2/5/19 7 0 None required None Required
Antietam 1990 2/8/19 6 0 None Required None Required
Ashland 2002 1/29/19 8 0 None Required None Required
Bennett 1996 2/8/19 7 0 None Required None Required
Bristow Run 1998 1/29/19 7 0 None Required None Required
Buckland Mills 2006 2/7/19 7 0 None Required None Required
Cedar Point 2001 1/29/19 7 0 None Required None Required
Covington-Harper 2017 2/7/19 8 0 None Required None Required
Ellis 2004 2/8/19 6 0 None Required None Required
Fitzgerald 2008 2/7/19 8 0 None Required None Required
Glenkirk 2005 1/29/19 7 0 None Required None Required
Gravely 2008 2/5/19 7 0 None Required None Required
Haymarket 2013 2/5/19 7 0 None Required None Required
Kilby 2017 2/8/19 8 0 None Required None Required
Leesylvania 1996 2/7/19 7 0 None Required None Required
Marshall 1994 2/14/19 7 0 None Required None Required
McAuliffe 1989 2/8/19 5 0 None Required None Required
Montclair 1991 2/14/19 8 0 None Required None Required
Mountain View 1995 2/13/19 6 0 None Required None Required
Mullen 1990 2/26/19 7 0 None Required None Required
Nokesville School, The 2013 3/22/19 10 0 None Required None Required
Old Bridge 1995 3/5/19 6 0 None Required None Required
Penn 1998 3/5/19 7 0 None Required None Required
Piney Branch 2011 2/26/19 8 0 None Required None Required
Porter Traditional 2004 5/3/19 6 0 None Required None Required
River Oaks 1990 3/6/19 7 0 None Required None Required
Rosa Parks 2006 3/8/19 8 0 None Required None Required
Signal Hill 2000 2/15/19 7 0 None Required None Required
Swans Creek 2001 1/24/19 8 0 None Required None Required
Triangle 2010 3/6/19 8 0 None Required None Required
Victory 2005 2/26/19 7 0 None Required None Required
Westridge 1989 3/5/19 6 0 None Required None Required
Williams 2004 3/6/19 8 0 None Required None Required
Wilson 2016 3/8/19 8 0 None Required None Required
Wood 2011 2/27/19 8 0 None Required None Required
Yorkshire 2009 2/15/19 8 0 None Required None Required
Yung 2015 2/13/19 8 0 None Required None Required

Middle School

School/Facility Original Construction Year Sampling Schedule* Total Samples Samples=> Action Level (15 ppb) Corrective Action Taken (if necessary) Retest Level (post corrective action)
Benton 2000 3/5/19 8 0 None Required None Required
Beville 1991 3/8/19 6 0 None Required None Required
Bull Run 2002 3/22/19 7 0 None Required None Required
Gainesville 2007 4/23/19 6 0 None Required None Required
Lake Ridge 1989 4/10/19 5 0 None Required None Required
Marsteller 2002 4/24/19 6 1 Filter installed 6
Potomac 2006 3/6/19 8 0 None Required None Required
Reagan 2012 4/11/19 7 0 None Required None Required
Saunders 1988 3/7/19 6 0 None Required None Required

High School

School/Facility Original Construction Year Sampling Schedule* Total Samples Samples=> Action Level (15 ppb) Corrective Action Taken (if necessary) Retest Level (post corrective action)
Battlefield 2004 2/13/19 12 0 None Required None Required
Colgan 2016 3/7/19 12 0 None Required None Required
Forest Park 2000 3/8/19 10 0 None Required None Required
Freedom 2004 4/9/19 11 0 None Required None Required
Hylton 1991 4/5/19 10 0 None Required None Required
Patriot 2011 2/27/19 12 0 None Required None Required

Specialty Schools/Programs

School/Facility Original Construction Year Sampling Schedule* Total Samples Samples=> Action Level (15 ppb) Corrective Action Taken (if necessary) Retest Level (post corrective action)
Independence Nontraditional School 2017 4/9/19 8 0 None Required None Required
Pace West 2012 3/22/19 4 0 None Required None Required

Administrative Buildings (both pre and post 1986 original construction)

School/Facility Original Construction Year Sampling Schedule* Total Samples Samples=> Action Level (15 ppb) Corrective Action Taken (if necessary) Retest Level (post corrective action)
Brentsville Transportation 1970 3/22/19 1 0 None Required None Required
Central Transportation 2003 5/10/19 1 0 None Required None Required
Independent Hill Complex 1985 5/3/19 7 0 None Required None Required
Kelly Leadership 2008 3/22/19 7 0 None Required None Required
Gar-Field Bus 2014 5/10/19 1 0 None Required None Required
McCuin Transportation 2002 5/9/19 1 0 None Required None Required
Potomac Transportation 1988 5/8/19 2 1 Filter installed; retested 5